News

What's new at Ei.

Articles, case studies and monthly release notes from the Ei team, in one place.

Sign in
Case study

Leveraging 3D Implementation for Inspections and Safety Use Case

Captured for a turnaround. Used by inspections. A Gulf Coast chemical plant implemented Ei Everywhere for turnaround planning and execution, then its safety and inspections teams used the same foundation to inventory 60 walkways, platforms, and stairs for which no engineering drawing existed — driving safety and efficiency at the plant.

Read more
Case studyDigital Workflows

Critical Job Planning with Ei Everywhere

With Ei Everywhere, it’s easy to get all stakeholders and contractors on the same page about a critical job, all virtually. Using the same data used to plan a job, Ei Everywhere can be virtually “play” all job steps.

Read more
Case studyTurnaround

Critical Job Planning Reduces Onsite Surprises, Cost and Schedule Overrun

Using the Ei Everywhere portal developed to plan their turnaround, recently, a customer was able to create a "fly through video" of the job to show the critical steps involved.

Read more
Case studyTurnaround

Decon Tie-Point Job Planning Case Study

Recently, a Turnaround Planning Engineer was able to plan all of their decontamination tie-points in only 2 hours with Ei Everywhere, a task that formerly would take him over 170 hours.

Read more
Case studyOperations

Time-on-Tool Increase + Reduced Operations Burden

Recently, Ei supported a customer's turnaround by placing Ei Everywhere iPad Kiosks around the unit running the Ei Everywhere Kiosk-Optimized iPad App, allowing contractors to easily search for equipment, search for jobs, and report safety hazards.

Read more
Case studyTurnaround

Reduced Contractor Costs: Scaffold Planners and Engineering Contractors

Recently, a customer was able to save nearly $200,000 in engineering contractor costs for pre-job verification; and another customer saved over $200,000 in scaffold planning and verification cost with Ei Everywhere.

Read more
Case studyDigital Workflows

P&ID-Based MOC Process Validation

Ei performed a forensic analysis of the site’s AutoCAD database, along with efficient MOC documentation (hard copy) and field spot checks, to support a facility improve their best-in-class Management of Change (MOC) program through performing targeted, data-based MOC validation (QA/QC) checks.

Read more
Case studyP&IDs

Case Study: 3-6 Month Payback Period on P&ID Highlights?

Whether you’re currently maintaining your LDAR highlighted P&ID or not, Ei’s LDAR P&ID highlighting subscription delivering smartPDF format P&IDs to your compliance program can save you money in as little as 5 months. How?

Read more

Subscribe to our Newsletter

Subscribe to our newsletter and never miss our latest news, feature updates, and exciting innovations.