News
What's new at Ei.
Articles, case studies and monthly release notes from the Ei team, in one place.
Decon Tie-Point Job Planning Case Study
Recently, a Turnaround Planning Engineer was able to plan all of their decontamination tie-points in only 2 hours with Ei Everywhere, a task that formerly would take him over 170 hours.
Read moreTime-on-Tool Increase + Reduced Operations Burden
Recently, Ei supported a customer's turnaround by placing Ei Everywhere iPad Kiosks around the unit running the Ei Everywhere Kiosk-Optimized iPad App, allowing contractors to easily search for equipment, search for jobs, and report safety hazards.
Read moreReduced Contractor Costs: Scaffold Planners and Engineering Contractors
Recently, a customer was able to save nearly $200,000 in engineering contractor costs for pre-job verification; and another customer saved over $200,000 in scaffold planning and verification cost with Ei Everywhere.
Read moreNext Generation Leak Detection and Repair
At Ei, we know compliance, including Leak Detection and Repair (LDAR). Click below to see how Ei Everywhere is being used to develop and maintain LDAR programs better, faster, and less-costly than traditional methods.
Read moreLogistics Planning with Ei Everywhere
With Ei Everywhere, it’s easy to plan logistics on your next project. Visualize the unit, collaborate with you team, and proactively identify (and prevent) bottlenecks on your next project.
Read moreDebottleneck Your Next Turnaround with Ei
Ei’s next-generation tooling for turnaround planning and execution will save you millions with virtual fly-throughs, improved communication, collaboration, and hazard communication. Some ways we help:
Read moreP&ID-Based MOC Process Validation
Ei performed a forensic analysis of the site’s AutoCAD database, along with efficient MOC documentation (hard copy) and field spot checks, to support a facility improve their best-in-class Management of Change (MOC) program through performing targeted, data-based MOC validation (QA/QC) checks.
Read moreP&ID Revalidation Best Practices
Read moreCase Study: 3-6 Month Payback Period on P&ID Highlights?
Whether you’re currently maintaining your LDAR highlighted P&ID or not, Ei’s LDAR P&ID highlighting subscription delivering smartPDF format P&IDs to your compliance program can save you money in as little as 5 months. How?
Read more