case studies
Learn from our Case Studies.
Digital Workflows
January 1, 2023
Critical Job Planning with Ei Everywhere
With Ei Everywhere, it’s easy to get all stakeholders and contractors on the same page about a critical job, all virtually. Using the same data used to plan a job, Ei Everywhere can be virtually “play” all job steps.
Read MoreTurnaround
July 4, 2021
Critical Job Planning Reduces Onsite Surprises, Cost and Schedule Overrun
Using the Ei Everywhere portal developed to plan their turnaround, recently, a customer was able to create a "fly through video" of the job to show the critical steps involved.
Read MoreOperations
April 7, 2021
Time-on-Tool Increase + Reduced Operations Burden
Recently, Ei supported a customer's turnaround by placing Ei Everywhere iPad Kiosks around the unit running the Ei Everywhere Kiosk-Optimized iPad App, allowing contractors to easily search for equipment, search for jobs, and report safety hazards.
Read MoreTurnaround
April 7, 2021
Reduced Contractor Costs: Scaffold Planners and Engineering Contractors
Recently, a customer was able to save nearly $200,000 in engineering contractor costs for pre-job verification; and another customer saved over $200,000 in scaffold planning and verification cost with Ei Everywhere.
Read MoreTurnaround
April 7, 2021
Decon Tie-Point Job Planning Case Study
Recently, a Turnaround Planning Engineer was able to plan all of their decontamination tie-points in only 2 hours with Ei Everywhere, a task that formerly would take him over 170 hours.
Read MoreDigital Workflows
July 17, 2017
P&ID-Based MOC Process Validation
Ei performed a forensic analysis of the site’s AutoCAD database, along with efficient MOC documentation (hard copy) and field spot checks, to support a facility improve their best-in-class Management of Change (MOC) program through performing targeted, data-based MOC validation (QA/QC) checks.
Read More